A 5-day trek from Sirimon to Chogoria via Shipton and Point Lenana that balances steady acclimatization with dramatic high-altitude views. Expect forested trails, moorland, stone quarries and a pre-dawn summit push to 4,985 m.
A 5-day trek from Sirimon to Chogoria via Shipton and Point Lenana that balances steady acclimatization with dramatic high-altitude views. Expect forested trails, moorland, stone quarries and a pre-dawn summit push to 4,985 m.
A pre-dawn headlamp beam threads the Sirimon valley as a cold wind pushes through high moorland. You climb through moss-draped forest into heath, then step out onto open slopes where rock and grass trade places with each rising metre. On summit morning the stony quarry to Point Lenana gives way to a raw, thin-air sunrise that makes every step count.
Verified experiences and guided adventures in the surrounding area.
Operated by Bushtroop Tours and Safaris · Nanyuki, Laikipia County
A pre-dawn headlamp beam threads the Sirimon valley as a cold wind pushes through high moorland. You climb through moss-draped forest into heath, then step out onto open slopes where rock and grass trade places with each rising metre. On summit morning the stony quarry to Point Lenana gives way to a raw, thin-air sunrise that makes every step count.
Geology here is blunt and ancient: Mount Kenya is a heavily eroded stratovolcano whose jagged peaks—Batian and Nelion—rise from glacial cirques. The massif shaped local Kikuyu and Meru culture for centuries and Mount Kenya National Park, created in 1949 and a UNESCO World Heritage Site, protects both wildlife and water catchments that millions downstream rely on.
This five-day Sirimon–Shipton–Point Lenana–Chogoria trek is built for steady ascent and acclimatization: expect daily hikes of 6–7 hours, total distances around 40–50 km, and camps between 2,950 m and 4,200 m before the 3–4 hour pre-dawn push to 4,985 m Point Lenana. Terrain alternates packed trail, scree and tussock moorland; mountain huts and basic shelters punctuate nights.
Practical edge: pace conservatively, carry layers for wind and radiative cold, and drink more than you think—altitude drains hydration. Guides and porters are recommended for route-finding and load management. The sunrise from Lenana is the payoff, but success hinges on acclimatization, sturdy footwear, and timing your summit attempt for clear morning windows.
No—Point Lenana is a non-technical trek; routes use trails, scree and stone steps, so no ropes or technical gear are required.
Mount Kenya National Park requires park fees and entry permits; these are typically arranged by your operator or on arrival at the park gates.
Altitude is a real risk—symptoms can appear above 3,000 m; the itinerary includes an acclimatization day at Shipton Camp to reduce risk, but monitor symptoms and descend if they worsen.
Guides are strongly recommended for route knowledge, safety and permitting logistics; porters ease the load and improve ascent success but are optional depending on fitness and packing.
Bushtroop Tours and Safaris operates guided outdoor trips and adventures with an emphasis on safety, stewardship, and memorable experiences.




A pre-dawn headlamp beam threads the Sirimon valley as a cold wind pushes through high moorland. You climb through moss-draped forest into heath, then step out onto open slopes where rock and grass trade places with each rising metre. On summit morning the stony quarry to Point Lenana gives way to a raw, thin-air sunrise that makes every step count.
A pre-dawn headlamp beam threads the Sirimon valley as a cold wind pushes through high moorland. You climb through moss-draped forest into heath, then step out onto open slopes where rock and grass trade places with each rising metre. On summit morning the stony quarry to Point Lenana gives way to a raw, thin-air sunrise that makes every step count.
Geology here is blunt and ancient: Mount Kenya is a heavily eroded stratovolcano whose jagged peaks—Batian and Nelion—rise from glacial cirques. The massif shaped local Kikuyu and Meru culture for centuries and Mount Kenya National Park, created in 1949 and a UNESCO World Heritage Site, protects both wildlife and water catchments that millions downstream rely on.
This five-day Sirimon–Shipton–Point Lenana–Chogoria trek is built for steady ascent and acclimatization: expect daily hikes of 6–7 hours, total distances around 40–50 km, and camps between 2,950 m and 4,200 m before the 3–4 hour pre-dawn push to 4,985 m Point Lenana. Terrain alternates packed trail, scree and tussock moorland; mountain huts and basic shelters punctuate nights.
Practical edge: pace conservatively, carry layers for wind and radiative cold, and drink more than you think—altitude drains hydration. Guides and porters are recommended for route-finding and load management. The sunrise from Lenana is the payoff, but success hinges on acclimatization, sturdy footwear, and timing your summit attempt for clear morning windows.